Pages

Showing posts with label deck. Show all posts
Showing posts with label deck. Show all posts

Wednesday, January 4, 2012

Heap Big Job Mate! A new cockpit floor with Beckson Hatches

L1010822
 
The original sole looking aft at left
.
A big job replacing the cockpit sole with Beckson hatches  for access. Mark Corke explains how...

When I built Mallard my gaff rigged cutter I was never quite sure how to finish off the sole of the cockpit. On the one hand the cockpit needed to be water tight but on the other hand I also needed to have access for essential maintenance to the stuffing box and primary fuel filter. The other problem was that the cockpit sole was very close to the water line so rigging up the drains so that they would be self draining also became something of a headache, on a larger boat with more free-board the sole is higher and the water can run through drains and exit the boat above the waterline. This was not possible on Mallard so in the end I connected both drains to an inch and quarter sea cock in the bottom of the boat. This worked well enough but it meant that the sea cock had to remain open even when I was not on the boat and this made me nervous not least because if the clamps let go or the sea cock failed water would flood in and the boat would sink. I thought about the problem for several years not quite sure what to do. Finally I came up with the solution that you see in the following pictures, the old sole was completely removed and a now marine plywood sole installed. Two Beckson watertight hatches were fitted to allow continued access to the area under the cockpit and the drains were routed to a self contained sump pump which keeps the cockpit dry and means that the large sea cock can be dispensed with allow me to sleep easier at night.
 Of course every boat will be different and if the hatches are installed in a cored fiberglass deck then I would recommend scooping out some of the core after the cut out has been made and filling with a thicken epoxy to prevent water from migrating into the core material.
 One final point and that is to carefully think through the install before you go cutting into anything; will the hatch interfere with anything above and below decks, will it weaken the boat and do I have the necessary skill set and tools to enable me to complete the installation in professional manner.

Here's how I went about it in words and pictures.

L1010843 
Step one was to remove the old drains, which were big, mostly because they incorporate a non return ball valve to prevent water from sloshing back up into the cockpit.
 L1010848
The next step was probably the most time consuming of the whole project for me, it was certainly the messiest. Using a Fein multimaster I cut out the existing sole but left the bearers in place as I would need these later to support the new sole.
 L1010851
Once the old sole was out of the way I was able to accurately measure for the new half inch marine plywood that would make up the new section. I then cut this out with a circular saw with a fine tooth blade but I could have used a jigsaw. To allow a little room for the epoxy and also to make sure that the ply would not get jammed in I allowed an eighth of an inch clearance all the way around.
 

L1010856 
After cutting out the ply to the correct overall dimensions the cut outs for the hatches were marked and then cut out with a jig saw. Like the overall size of the play I made the cut outs and eighth oversize to allow for a little movement.
 L1010862
I then bored for the new drains which was much easier to do off the boat. I used a drill press which gave a perfect hole but a hand held drill would have been almost as good had the machine not been available.
 L1010869
I used a brass plumbing fitting from my local home store which has a screw on one end and a barb on the other which is perfect for three quarter inch inside diameter hose. With the holes drilled I had a dry run before permanently gluing them in position.
 L1010873
Mixing up some epoxy thickened with colloidal silica and wood flour to a mayonnaise consistency I used mahogany dust which gives it the brown color.
 L1010876
I then spread a goodly amount onto the screw threads and the inside of the hole and screw the fitting down into position, notice the squeeze out which is ideal. I then left the epoxy to set overnight.
 L1010883
With the epoxy set I used an 80 grit disc on the random orbit sander to sand the brass fitting which was slightly proud of the plywood flush. It is important to keep the sander moving for if the brass gets too hot it will soften the epoxy and could weaken the bond.
 L1010885
There are two things to do before the the sole can finally be permanently glued in place; drill and countersink holes for the fixing screws and coat both sides of the sole with unthickend epoxy to seal out any moisture.
 L1010888
The sole is then ready to be installed and I glued it in place with epoxy thickened to the consistency of peanut butter with colloidal silica which makes a very strong bond once set.
 L1010890
With the epoxy still wet the sole is screwed in place. In truth the epoxy is plenty up to the task without using any screws but the screws hold the sole in place whilst the epoxy sets up and don't do any harm if left in position. I used brass screws but if they were in an area that were to be subjected to a lot of sea water than I would have used bronze.
 L1010892
With the sole screwed in place I used some more thickened epoxy to fill over the top of the screws and form a fillet (pronounced fill-it) in the corner to provide a smooth transition from the cockpit side to the sole. A maxed out credit card with the corner trimmed to a large radius makes the perfect tool.
 L1020013
When the epoxy has set after a day or two the whole sole and fillets were lightly sanded and the paint applied to match the existing surrounding paint. I have found that the best paint over epoxy seems to be the Interlux Epoxy Prime Kote which is then followed up with the colored top coats.
 L1020019
With the paint dry the next and final stage of the job can start. The hatches are dropped back into position and the holes for the mounting bolts made. I used an automatic center drill to create a pilot hole. When all these have been completed I removed the hatch once more and set it aside.
 L1020022
On the underside of the hatch in hard to read writing is stamped 'use a 12 mm diameter drill'. This is to allow the hatch to move during temperature extremes. It may be tempting to simply fix the hatch in place with some suitable wood screws but it you do there is a good chance that the plastic around the mounting holes will crack as the hatch expands and contracts at different rates to the ply substrate.
 L1020028
Using the pilot holes as a guide I drilled the holes to the specified 12 mm with an auger drill.
 L1020032
The hatch is ready to be installed but before squirting on the silicone I taped some blue painters tape all around the opening where I knew it would project under the hatch flange. With the hatch dropped back in place a razor blade is run around the perimeter tracing the outline and cutting through the tape.
L1020033
The hatch is once more removed and the tape on the inside of the cut is peeled off.
 L1020037
Some silicone sealant is applied around the entire perimeter.
 L1020040
The hatch is then bolted into position with 10-24 stainless steel flat head machine screws, backed up on the underside with fender washers and nuts which are also stainless.
 L1020042
Then the perimeter tape is peeled up pulling any squeeze out with it leaving a nice clean and tidy job with no need of any rags or chemical solvents.
 L1020047
The finished job all ready for another season. A teak floor grating will be installed in due course.

Friday, June 17, 2011

Teak Deck Re-Caulking



sv Sobraon spent a few weeks re-caulking their teak deck. Here's how they did it
The caulking on the cabin top deck has significantly deteriorated.  The deck was installed just prior to when we purchased the boat but from a very early point we noticed that the Sikaflex caulking was drying, cracking and coming away from the edges.  It had reached a point where it was literally falling out of the channels in the teak.  If we didn't remove it and re-caulk we may develop deck leaks especially with the coming wet season.


The caulking was Sikaflex. It dried and failed after only a few years.
The caulking was removed by hand. Most of it just pulled straight out with very little residual caulking left in the grove. It obviously was not providing any sort of water seal.


It was originally applied with a primer and break out tape, however, it came away very easilya

The grooves were then cleaned with a modified screwdriver.  Scraping it through the groove removed any caulking that was still holding on to the teak.  It also could be turned to clean on the bottom of the channels. ( Piere on SV 'Tea' gave me his version of the tool made from an old file.  It is a little sharper than the screwdriver and can be used more like a hand plane to clean the bottom of the groove.)



The screwdriver made the job of cleaning out any caulking residue easy.

With the old caulking removed the deck was lightly sanded with 60 grit to even out any major imperfections and smooth it to make it easier for the tape to stick down.


The deck was only lightly sanded to aid the masking tape adhesion.
It will be final sanded when the caulking is complete.
Once the grooves were cleared we hand sanded the channels with 100 grit to clean the sides in preparation for the caulking primer.


The grooves were thoroughly sanded to ensure a good bond with the Deckflex.

We did the deck in small sections to make the job more manageable.

By breaking the projects into smaller chunks an area can be
cleaned, taped, primed and caulked comfortably in a day


The channels were carefully masked to minimise the spread of the deckflex MSP100 onto the teak. The tape is positioned about 1/2 mm away from the edge of the channel so as to ensure the tape doesn't protrude into the groove.


The masking whilst laborious saved a lot of time in the clean up

The channel was then primed with MSP 10 Deck Primer. During the refurb of the rear deck we ran out of the MSP 10 and it is not readily available in Malaysia. We spoke to Troy at Fixtech Australia. He suggested that an alternative primer is Internationals Everdure Epoxy.  We were able to get this from Singapore so the rear has been primed with Everdure.  ( It will be interesting to compare the 2 decks in a few years time.)


Primed and ready for caulking

We waited approximately 2 hrs then gunned the MSP 100 into the channel taking care to slightly overfill the groove.  After applying the bead into a channel a plastic trowel was lightly dragged over the bead to smooth the MS 100 and minimise the amount of sanding that will be required to complete the project.

We used 18 x 600ml sausages of MSP100 to complete the entire deck

After about 2 hours the tape is removed leaving clean straight lines.
The taping step saves a lot of sanding and leaves the teak with crisp shar

Removing the tape. The tape leaves a crisp straight line.

After 2 hours the MSP 100 is dry on the tape but soft enough to come away cleanly.

.

This is the rear hatch after the tape was removed. It is now ready for final sanding

This is the rear hatch after  final sanding and the Teak Seal Colour Protector and Silver Protector have been applied.

The front and rear decks were sanded and trimmed ready for the Teak Seal Colour Protector.



The decks are now finished. 
 
It took a little over 3 weeks to finish the decks but the improvement is considerable. We had to sand some of the teak thickness away to clean up the deck, however I hope that with proper maintenance we should lose less material now.